Building Regulations
  Summary of the Regulations
  Approved Documents
  Contraventions and Appeals
  Fees
 
Click to Download Document
The Approved Documents
 
Part H: Drainage and Waste Disposal
H1. Foul water drainage An adequate system of drainage should be provided to carry foul water from appliances within the building to either a public sewer, private sewer, septic tank or cesspool.
 
H2. Wastewater treatment systems and cesspools This section deals with the design and siting of septic tanks, wastewater treatment systems and cesspools.
 
H3. Rainwater drainage Adequate provision should be made for rainwater to be carried from the roof of a building to either a soakaway, watercourse or sewer
 
H4. Building over sewers The erection or extension of a building or underpinning works should be carried out in such a way that is not detrimental to any drain or sewer.
 
H5. Separate system of drainage This section deals with the need to keep rainwater drainage separate from foul drainage wherever practicable.
 
H6. Solid waste storage Adequate provision should be made for storage of solid waste, access to the place of storage and, from there to a collection point (where one has been specified by the waste collection authority)
 
Click here for a downloadable version of the Approved Document Part H
Approved Document H - Drainage and Waste Disposal (2002 edition) (PDF 2133 Kb)
 
Archived Copies
 
Approved Document H - 1990 edition, amended 1992
Valid: 1st June 1992 - 1st April 2002
The requirement in this edition was:
H1 - Sanitary pipework and drainage
H2 - Cesspools and tanks
H3 - Rainwater drainage
H4 - Solid waste storage
 
 
Approved Document H - 1990 edition
Valid: 1st April 1990 - 1st June 1992
The requirement in this edition was:
H1 - Sanitary pipework and drainage
H2 - Cesspools and tanks
H3 - Rainwater drainage
H4 - Solid waste storage
 
 
Approved Document H - 1985 edition
Valid: 11th November 1985 - 1st April 2002
The requirement in this edition was:
H1 - Sanitary pipework and drainage
H2 - Cesspools and tanks
H3 - Rainwater drainage
H4 - Solid waste storage
 
 
 
 
Cheshire East Building Control 2009